Goshen’s Millrace sits nearly empty of water after being drained in preparation for work on a bank restoration project. The section to be restored begins just north of the Douglas Street pedestrian bridge and extends north to Monroe Street. As part of the project, brush on the bank will be removed and a natural bank will be created that will incorporate a variety of native vegetation. A portion from Purl Street extending north approximately 500 feet will be the site of more extensive excavation work required to deal with contaminated soils. The anticipated completion date is April 1.